In addition, WE CAN Make Customized VARIATORS, GEARED MOTORS, Electric powered MOTORS AND OTHER HYDRAULIC Merchandise In accordance TO CUSTOMERS’ DRAWINGS.
Overview
Fast Information
- After Guarantee Service:
-
Video technical assist
- Neighborhood Service Location:
-
Egypt
- Showroom Location:
-
Egypt
- Type:
-
elements
- After-income Support Offered:
-
Video clip complex assist
Source Capability
- Source Ability:
- 3000 Piece/Parts for each Thirty day period
Packaging & Shipping and delivery
- Packaging Information
- packaged in plywood circumstance or PALLET
- Port
- NINGBO/SHANGHAI, CHINA
-
Guide Time
: -
Amount(Baggage) one – 50 >50 Est. Time(days) 15 To be negotiated
On the internet Customization
Cat 3 Point Hitch How do I run the PTO on my tractor? Prior to working the PTO, you will require your tractor to reach the beginning RPM (revolutions per moment). After the commencing RPM has been achieved you can begin working the PTO.
Solution Description
one. Gearbox is made up of hydraulic motor, multi-disc friction braker and planet gearbox decelerator. Obtaining traits of little, gentle, big torque, large begin and transmission effectiveness, minimal noise, ect. Output shaft can bear massive axial force.
two. Hydraulic transimiAND Hi-TECH GEARING Technologies Our Fellbach plant gives best engineering and manufacturing amenities for unique gearboxes and gearing – from conception via to serial creation.ssion can be applied in sorts of hydraulic transimission method and rotating amenities.
Traits
Attributes:
1.Reduced sounds
two.Large staring torque ( mechanical effectiveness enhanced to above .9 ), great steadiness when reduced pace.
three.Large volumetic performance
4.Increased mechanical efficiency
five.Reverse rotating offered
six.Radial and axial load obtainable
seven.Higher kw/kg rati
Technological Info
Kind | Displacement ml/r | Max.force Mpa | Max.torque N•m | Pace selection r/min | Ratio of gearbox | Associated motor |
Weight kg |
Length mm |
ZJM960/B | 960 | 16 | 1920 | 3-eighty three | 6 | BM4-a hundred and sixty | 40 | 314 |
ZJM1200/B | 1200 | sixteen | 2200 | 3-eighty three | six | BM4-200 | 40 | 318 |
ZJM1500/B | 1500 | sixteen | 2750 | 3-66 | six | BM4-250 | forty | 323 |
ZJM1900/B | 1900 | thirteen.7 | 3000 | 3-sixty | 6 | BM4-320 | 40 | 330 |
ZJM2400/B | 2400 | sixteen | 4375 | two-52 | 6 | BM5S1-400 | eighty | 363 |
ZJM3000/B | 3000 | sixteen | 5520 | 2-forty six | 6 | BM5S1-500 | eighty | 380 |
ZJM3800/B | 3750 | thirteen.9 | 6000 | 2-forty | six | BM5S1-630 | eighty | 392 |
ZJM600/C | 580 | 25 | 2100 | 3-150 | six | JMDG2-100 | 45 | 350 |
ZJM900/C | 940 | 25 | 2825 | 3-one hundred fifty | 6 | JMDG2-a hundred and fifty | forty five | 350 |
ZJM1000/C | 1050 | twenty | 2630 | 3-150 | 6 | JMDG2-one hundred seventy five | 45 | 350 |
ZJM1200/C | 1200 | 20 | 3000 | three-130 | 6 | JMDG2-two hundred | 45 | 350 |
ZJM1500/C | 1520 | twenty five | 4780 | 2-one hundred ten | 6 | JMDG3-250 | 85 | 345 |
ZJM1800/C | 1730 | twenty | 4500 | two-80 | six | JMDG3-300 | 85 | 345 |
ZJM2100/C | 2100 | twenty | 5260 | 2-65 | six | JMDG3-350 | eighty five | 345 |
ZJM7000/C | 6900 | twenty | 17500 | 3-65 | five | JMDG16-1400 | – | 478 |
ZJM10000/C | 10000 | twenty | 25400 | 3-forty five | five | JMDG16-2000 | – | 478 |
ZJM12000/C | 12000 | sixteen | 24000 | three-40 | five | JMDG16-2400 | – | 478 |
Much more Merchandise
Organization Details
Packaging & Shipping
OEM | indeed |
Lead Time | five-20 working days for less than 1500pcs |
Payment | L/C,T/T |
thirty% advance payment,the balance paid before shipment | |
Packing | Motor each have their own carton,the outer packing is a five-layer plywood boxes |
Shipping | one)By air or sea or combined transportation |
2)Express:TNT,FEDEX,UPS,DHL |
Adhering to “Survival by Good quality, Growth by Engineering & Credit score”, The organization will consistently improve product performance to meet the growing customer demands in the arduous fashion of work.